BREAKING: Electrify America Temporarily SWITCHES OFF 150kW, 350kW Electric Car CHARGING STATIONS!

Electrify America has just announced that its 150 kW and 350 kW charging stations have been deactivated as a matter of  “an abundance of caution” after the manufacturer of those stations, HUBER+SUHNER notified its customers that there was a potential safety issue involving the liquid cooled cables used on those stations.

Here’s a quick 50,000 foot view into the situation, as well as a warning for anyone planning to use the network this weekend. While some sites will remain operational, Electrify America has stated only 50 kW CHAdeMO and CCS charging stations (as well as level 2, where applicable) will be operational. This could lead to longer charge times and/or congestion at charging sites.

Read the full statement, including a list of affected sites, here: https://elam-cms-assets.s3.amazonaws.com/inline-files/Electrify%20America%20Announcement%20on%20Partial%20Network%20Shutdown%201.25.2019.pdf

It is not clear if the issue affects charging stations operated by other networks. We will of course keep you posted of any changes as they occur.


Buy the team a coffee — or a meal! https://ko-fi.com/transportevolved

Follow the show on Twitter https://www.twitter.com/TransportEvolve

Buy Transport Evolved SWAG : https://teespring.com/stores/transport-evolved

Join or Discord Channel: https://discord.gg/9WAjfQn

Support us on Patreon: https://www.patreon.com/transportevolved

______________________________________

Want to keep up with the latest news in evolving transport? Don’t forget to follow Transport Evolved on Twitter, like us on Facebook and G+, and subscribe to our YouTube channel.

You can also support us directly as a monthly supporting member by visiting Patreon.com.

Related News